Skip to content
Opera Oslo

Case Studies

Game Changing Projects

release notes-3
Sign up
Gabor GulyasOperations Manager, DBMV​

dRofus proved to be the best tool to consolidate all of the data coming from all of the different sources and provide a single source of truth"

Sign up
Viktor VarkonyiChief Division Officer, Design Division - Nemetschek Group

‘’dRofus has been used as the Master Asset Database for all disciplines on several healthcare facilities, from early planning through to the construction and handover, and into operation. dRofus synchronizes with the models – always up to date and always available to all stakeholders. The results are significant savings, better control, and substantially better outcomes. This is a true innovation to maximise collaboration and efficiency’’ 

 

Sign up
Thomas von Küstenfeld Head of Design Systems, HENN

"With dRofus, we enable central access to important room information for everyone involved in our projects. Online and in real time."


Logo_COWI_AB

 

Sign up
Marta GjerdåkerHVAC Engineer, COWI

“In this project we work with the documentation to get it delivered and controlled before work starts on the site. And it differs from a normal project where all the documentations are delivered after the building is finished and the quality of the documentation is maybe not usually as good. In this project we have it delivered and controlled before we start building.

Sign up
Vicky PatelPractice Technology Manager and firmwide BIM Manager, HKS

The most enjoyable thing about dRofus is the data continuity. When I was introduced to it, I realized that this is the missing link. We haven’t been doing BIM we’ve been doing BM. This is the I.


HENN_Logo_26mm_96dpi_pos

 

Sign up
Kristian BrandsethHealthcare Bergen Building Owner, Main Project Leader

“The conclusion is that dRofus’ tools and workflows have generated huge savings and substantially better project outcomes and control for all project stakeholders”. 

Our customers

viktor__
thomas_
gabor_
marta_

Discover how companies in the AECO industry leverage dRofus to collaborate between stakeholders and how they are managing data successfully. Customer success stories such as these inspire and motivate us.

Innovation at the center of CMU
Read More
Centre Médical Universitaire

CMU in Geneva poses a huge challenge, since it is necessary to be able to work in an occupied site and to have the capacity to manage the data at all stages of the building's lifecycle

Read More
West Coast Healthcare Client
Read More
West Coast Healthcare Client

Major West Coast Healthcare owner adopts dRofus to streamline design standards, project planning and communication with all stakeholders

Read More
Etude de cas Saclay
Read More
Université Paris-Sud

A new biology­ pharmacy­chemistry centre of excellence at the Université Paris­ Sud on the Saclay Plateau

Read More
Baptist Health Jacksonville
Read More
Baptist Health Jacksonville

Founded in 1955, Baptist Health is ranked as the “most preferred” health care provider in Jacksonville, Florida. 

 

Read More
Helse Bergen HF
Read More
Helse Bergen HF

A unique documentation of why Building Lifecycle Intelligence™ truly represents the future for our industry

 

Read More
Conrad Gargett
Read More
Kingaroy Hospital

Collaboration, validation and documentation benefits for architect, client and other stakeholders on recent healthcare project

 

Read More
Queens Wharf
Read More
Queens Wharf

Queen’s Wharf Brisbane – the world-class entertainment precinct that captures the heart of Brisbane

 

Read More
Casey Hospital Expansion
Read More
Casey Hospital Expansion

Change tracking - the key to Casey hospital expansion project

 

Read More
Sunshine coast
Read More
Sunshine Coast Public University Hospital

dRofus has allowed us to streamline integration between our Architectural Model, equipment specifications, room data sheets and procurement

Read More
OSL T2
Read More
Oslo Airport Terminal 2

How The Oslo Airport Terminal 2 Project Successfully Solved the Data Management Challenge Using dRofus

Read More
NCCR
Read More
Stantec NCCCR

No one sits on the sidelines at NCCCR

 

Read More
Stantec Better Together
Read More
Stantec

dRofus checks all the boxes for Stantec

 

 

Read More
Walsh Cosntruction
Read More
Walsh Construction

dRofus makes P3 easy and connects the dots for Walsh

 

Read More
ICC
Read More
ICC Sydney

The multi-user platform allows the project team to collaborate more effectively and manage a dataintensive process

Read More
Shellharbour City Hub Library
Read More
Shellharbour City Hub

dRofus has been integrated as part of DesignInc Sydney’s core processes to streamline briefing and delivery phases

 

Read More
North Island Hospital Project
Read More
North Island Hospital Project

dRofus helped maintain the evolving project program with ease and reliability

 

Read More
Statsbygg Operaen
Read More
Statsbygg

We were searching for tools that could help us specify our client requirements in building construction projects as a model that could be shared

Read More
VA Healthcare Center Kernersville
Read More
VA Healthcare Center Kernersville

dRofus saved our team an enormous amount of time and effort eliminating inefficiencies

Read More
HOK 2 for 1
Read More
HOK 2 for 1

2 for 1: Two medical facilities equal one plan for HOK

 

Read More

What our customers say

“dRofus did all the things that we used to do manually in Excel or Revit directly all in a user-friendly interface that is fully customizable. dRofus checked all the boxes.”
stantec-logo_
tammy__
Tammy AdolfIntegrated Design Data Manager
"With dRofus, we enable central access to important room information for everyone involved in our projects. Online and in real time."
HENN_
thomas__
Thomas von KüstenfeldHead of Design Systems
“dRofus proved to be the best tool to consolidate all of the data coming from all of  the different sources and provide a single source of truth.
dbm-vircon
gabor__
Gabor GulyasOperations Manager​
dRofus allows us to do quick project planning. I can develop a program and get a snapshot in 20 minutes of what a project will cost. What used to take days now takes minutes.
Baptist-health-logo
Matthew Bode__
Matthew BodeSystem Dir. Of Planning & Design